How do you stop erosion on a Florida waterfront property?
Start by finding where the soil is going and what is moving it. Soil escaping through a seawall needs joint, filter and backfill repairs; a bare bank worn by waves and boat wakes may need plantings, toe protection or riprap; runoff gullies need drainage changes. Lasting fixes usually pair a repair at the water's edge with better water management on the land side.
When this service is usually considered
- Sinkholes or soft spots opening behind a seawall or bulkhead
- Soil, sand or fabric visible at wall joints, weep holes or drain outlets
- A natural bank, marsh edge or lakefront slope that is retreating or undercut
- Gullies where stormwater runs over the cap or around the ends of a wall
- Exposed roots, leaning trees or slumping soil along the shoreline
- Scour at the base of a wall after storms or heavy boat traffic
- Upcoming construction near the water that needs erosion and turbidity controls
Three Directions Erosion Comes From
The most useful diagnostic question is simple: which direction is the water coming from? Each source leaves different evidence and calls for different controls.
| Source | What It Looks Like | Typical Controls |
|---|---|---|
| From inside the wall | Sinkholes, settling pavers, soil stains on the wall face, sand or fabric at joints | Sealing joints, replacing filter fabric, filling voids and restoring backfill, repairing the wall itself |
| From the waterway | Undercut banks, scour at the toe of a wall, exposed roots, a retreating marsh edge | Native plantings, sills, toe protection, riprap or a wall, matched to wave energy |
| From the land side | Gullies, washouts at the ends of a wall, soil carried over the cap during heavy rain | Regrading, swales or berms, redirected downspouts and outfalls, vegetated buffers |
Many sites have more than one source at once. A wall losing soil through its joints often also has runoff concentrating at a low point along the cap, and a bare bank beside a seawall can erode where the wall ends. NOAA and U.S. Army Corps of Engineers guidance lists erosion of adjacent unprotected sites among the drawbacks of bulkheads and revetments, which is why the transitions at property lines deserve attention.
Soil Loss Behind Seawalls and Bulkheads
A seawall has to let water drain while holding soil back. Depending on the design, that job falls to tight joints, filter fabric, weep holes or a combination. When joints open, fabric tears or degrades, or the toe is undermined, each tide and rainstorm can carry a little soil through or under the wall. The yard behind settles, and voids can grow out of sight until a sinkhole opens.
Filling the hole does not stop the leak. Effective control usually means finding the escape points, repairing joints or fabric, filling voids, restoring compacted backfill and checking whether the wall, its anchors or its toe also need repair. See soil washout, sinkholes behind seawalls and joint separation.
Keep Clear of Sinkholes Near a Wall
Keep people, pets and vehicles away from sinkholes and soft ground near a seawall. A void can be larger below the surface than the opening suggests, and the wall beside it may be losing support.
Eroding Banks and Natural Shorelines
Not every waterfront has a wall. River banks, marsh edges, lakefronts and sloped yards erode when waves, boat wakes and currents remove soil faster than vegetation can hold it. Guidance from NOAA and the Corps notes that boat wakes can also generate waves, and it uses site conditions such as wave energy, fetch, slope and tidal range to match a stabilization method to the shoreline.
Options run from planting alone on quiet, gently sloped shorelines to structural toe protection where wave energy is higher. NOAA notes that living shorelines reduce erosion by absorbing wave energy and stabilizing soil, and that sheltered waters such as estuaries, bays and rivers are good candidates. Our shoreline stabilization page compares the full range of approaches, and riprap revetments covers rock protection.
For small plantings, Florida has a specific exemption. Rule 62-330.051(12)(e), F.A.C., covers restoring an eroding shoreline with native wetland plantings along 500 linear feet or less that extend no farther than 10 feet waterward of the mean or ordinary high water line. Its conditions include using commercially grown native stock, removing invasive species along the shoreline where practicable, and allowing biodegradable natural fiber logs or mats staked in place to support the plants.
Managing Runoff on the Land Side
Water running across a yard toward the waterway can undercut caps, wash out wall ends and carry fertilizer and sediment into the water. UF/IFAS's Florida-Friendly Landscaping program recommends keeping a low-maintenance zone at least 10 feet wide along the water, with no mowing, fertilizing or pesticides in that zone, and creating swales or berms where possible to keep stormwater from entering the water body.
- Redirect downspouts, pool drains and irrigation so they do not discharge at the top of the wall.
- Find the low points along the cap or yard where water concentrates and regrade them.
- Check that drain pipes passing through the wall are intact, so they are not carrying soil out with the water.
- Keep a vegetated strip behind the wall instead of bare soil or sand.
- Follow local codes on buffer requirements for natural waterways.
Erosion and Turbidity Control During Construction
Seawall, riprap and shoreline projects disturb soil right beside the water, and Florida's rules expect that soil to stay out of it. Where an exemption calls for them, the conditions in Rule 62-330.050(9), F.A.C., require turbidity, sedimentation and erosion to be controlled during and after construction, with erosion and sediment control measures installed and maintained to the specifications in the state's erosion and sediment control manuals. In waters accessible to manatees, sea turtles and other listed species, the same conditions require turbidity barriers to be secured and monitored to prevent entanglement, and in-water work to stop if a listed species comes within 50 feet of the work area.
Local requirements can add detail. Cape Coral's residential seawall repair guideline, for example, requires a floating turbidity screen enclosing the work during clearing, excavating, jetting and backfilling. Before work starts, ask how sediment will be contained, where excavated material will go and how disturbed ground will be stabilized when each phase ends.
Permits and Oceanfront Property
Erosion control can fall under several programs at once, depending on the method and location: the state environmental resource permitting rules and their exemptions, authorization to use state-owned submerged lands, federal authorization for work in navigable waters, and local building and land development codes. On sandy beaches fronting the Atlantic Ocean, the Gulf and the Straits of Florida, DEP's Coastal Construction Control Line program requires a permit for construction and excavation seaward of the line unless the activity is exempt. See Florida seawall permits for the agencies involved, and confirm with them before work starts.
Who Handles Erosion Control Requests
Erosion problems in Duval, St. Johns, Nassau, Clay, Flagler and Putnam counties are reviewed directly by Barefoot Marine Construction, the company that owns and operates Florida Bulk Head. Erosion work ranges from wall repairs to drainage and planting, so whether your specific scope is performed in-house is confirmed during the estimate. See Northeast Florida service.
In other parts of Florida, requests are welcome while an independent contractor network is being built. No partner contractors are confirmed yet, and any match depends on contractor availability. See how partner referrals work.
How a typical project moves forward
- Request a QuoteDescribe where you see soil loss and how quickly it has changed, and send photos of the yard, the wall or bank, and any drainage outlets.
- Site AssessmentThe site is checked for the source of the erosion: escape points in the wall, wave and wake exposure along banks, and runoff paths across the yard.
- Plan & PermitControls are matched to the cause, from joint and backfill repairs to plantings, toe protection or drainage changes, with permit needs and construction-phase sediment controls identified.
- Build or RepairWork proceeds with turbidity and sediment controls in place, and disturbed soil is stabilized as each phase is completed.
- Protect Your PropertyMaintain plantings and drainage, investigate any new settlement promptly instead of just refilling it, and recheck the site after storms.
What changes the scope and cost
Explore provisional scenarios in the Bulkhead Cost Calculator or read the Florida Bulkhead Cost Report.
An estimate is not an engineering evaluation
Contractor estimates and site assessments describe visible conditions and a proposed scope. Some projects require design or sign-off by a Florida-licensed professional engineer and permits from one or more agencies. See Florida seawall permits.
Frequently asked questions
Can I keep filling the sinkhole behind my seawall?
Refilling can make the area safer in the short term, but if soil is escaping through the wall the hole will likely return and the void may grow. The escape path needs to be found and repaired. Mark the spot, keep people away and arrange an assessment.
Will plants alone stop my shoreline from eroding?
On sheltered, low-energy shorelines with room for a gentle slope, plantings can stabilize soil. NOAA and Corps guidance describes vegetation-only approaches as suited to low wave energy and notes they offer no storm surge or high-water protection. Higher-energy sites usually need a sill, toe protection or a structure combined with plants.
Why is my bank eroding next to my neighbor's seawall?
Hard structures can increase erosion on adjacent unprotected shorelines, a drawback NOAA and Corps guidance notes for bulkheads and revetments. The end of a wall can concentrate wave energy and runoff. Solutions often involve a return wall, transition protection or coordinating with the neighbor.
Is erosion control the same as a living shoreline?
A living shoreline is one erosion control approach that uses plants, sand, rock or oyster materials to stabilize the edge. Erosion control is broader and also covers wall repairs, drainage changes and sediment control during construction.
Do I need a permit to plant along my shoreline?
Florida has an exemption for small native wetland plantings that meet specific conditions, including length and distance limits. Work on state-owned submerged lands or with federal involvement can still need authorization. Check the conditions and confirm with DEP before planting.
What does turbidity control involve on a seawall project?
Typically a floating turbidity curtain around the in-water work area, plus silt fencing or similar measures on land, kept in place and maintained until disturbed soil is stable. Florida's exemption conditions also require barriers to be secured so they do not entangle manatees or other listed species.
Sources and references
- Rule 62-330.050, F.A.C., Procedures for Review and Agency Action on Exemption Requests — Florida Department of State, Florida Administrative Code. Accessed November 2, 2026. Subsection (9): erosion, sedimentation and turbidity controls and listed-species conditions for exempt activities.
- Rule 62-330.051, F.A.C., Exempt Activities — Florida Department of State, Florida Administrative Code. Accessed November 2, 2026. Subsection (12)(e): restoration of an eroding shoreline with native wetland vegetation plantings.
- Principle 9: Protect the Waterfront — UF/IFAS Florida-Friendly Landscaping Program. Accessed November 2, 2026. Low-maintenance zone along the water and swales or berms to keep stormwater out.
- Natural and Structural Measures for Shoreline Stabilization (February 2015) — NOAA and U.S. Army Corps of Engineers (SAGE). Accessed November 2, 2026. Site factors including boat wakes, and benefits and disadvantages of green and gray techniques.
- Understanding Living Shorelines — NOAA Fisheries. Accessed November 2, 2026. How living shorelines reduce erosion and where they are typically suitable.
- Apply: Coastal Construction Control Line (CCCL) Permitting — Florida Department of Environmental Protection. Accessed November 2, 2026. CCCL jurisdiction on sandy beaches and the permit requirement seaward of the line.
- Seawall Repair Guideline: Residential (last rev. 06/29/2023) — City of Cape Coral. Accessed November 2, 2026. Floating turbidity screen requirement, cited as an example of local construction controls.
Regulations, programs and conditions change. Always confirm requirements with the agency that has jurisdiction over your property.
