Florida Seawall Permits: What Waterfront Owners Need to Know

Seawall and bulkhead work in Florida can involve several layers of government at once. This guide explains each layer, what the main exemptions do and do not cover, and how to find the offices that decide for your property.

Last reviewed November 2, 2026 Prepared by the Florida Bulk Head editorial team 16 cited sources
Quick answer

Do I need a permit to repair or replace a seawall in Florida?

Often, yes. It depends on your property, the waterway, the scope of work and which agencies have jurisdiction. Some work, such as restoring a seawall within 18 inches of its old face under set conditions, can be exempt from state environmental permitting, but federal, state-lands, beach and local building requirements can still apply. Confirm with each agency before work starts.

County permit guides

Published only where we have reviewed official county and municipal sources.

How Seawall Permitting Works in Florida

There is no single Florida seawall permit. A project can need approvals from the U.S. Army Corps of Engineers, from the Florida Department of Environmental Protection (DEP) or a water management district, from the state as owner of submerged lands, from DEP's beach program on sandy ocean and Gulf frontage, and from your county or city. Each applies its own rules, and an exemption from one does not excuse you from the others.

Florida's main exemption statute says so directly. Section 403.813(1), F.S. (opens in a new tab) states that its exemptions do not relieve anyone of the need for permission to use state-owned lands or from 'other requirements of county and municipal governments.'

Not Legal or Permitting Advice

This page summarizes official sources reviewed on November 2, 2026 for general education. It is not legal advice or a permit determination. Rules change, and only the agencies can decide what your project needs.

Agencies that commonly touch seawall and bulkhead work in Florida
AgencyWhat it regulatesWhere to start
U.S. Army Corps of Engineers, Jacksonville DistrictStructures and work in navigable waters (Section 10) and discharges of dredged or fill material into waters of the United States (Section 404)Corps Regulatory Request System (opens in a new tab)
Florida DEP district officesEnvironmental Resource Permits (ERP) for docks and other work serving a single-family home that is not part of a larger development, usually with any state-lands authorizationDEP Environmental Resource Permitting (opens in a new tab)
Water management districts (five)ERP applications that DEP does not handle, such as shoreline work that is part of a larger permitted developmentDEP list of districts and counties (opens in a new tab)
Board of Trustees of the Internal Improvement Trust Fund (through DEP or a district)Use of state-owned sovereign submerged lands, including aquatic preservesRule 18-21.005, F.A.C. (opens in a new tab)
DEP Coastal Construction Control Line ProgramConstruction and excavation seaward of the CCCL on sandy beaches fronting the Atlantic, the Gulf and the Straits of FloridaApply for a CCCL permit (opens in a new tab)
Florida Fish and Wildlife Conservation Commission (FWC)Manatee protection zones and county manatee protection plans used in permit reviewsFWC manatee protection plans (opens in a new tab)
County and city building departmentsBuilding permits, inspections and any local seawall, dock or water-and-navigation rulesYour county or city permit office; see the county guides below

Federal Permits From the Army Corps of Engineers

Under 33 CFR 322.3 (opens in a new tab), Department of the Army permits 'are required under section 10 for structures and/or work in or affecting navigable waters of the United States,' which covers most tidal waters. Separately, Section 404 of the Clean Water Act covers discharges of dredged or fill material, such as backfill or riprap placed below the high-water line in waters of the United States.

Much minor work is authorized through nationwide permits rather than individual permits. The Corps reissued them in a final action published January 8, 2026 (opens in a new tab); the 57 nationwide permits took effect March 15, 2026 and expire March 15, 2031. Two matter most for seawalls:

  • NWP 3 (Maintenance) covers 'the repair, rehabilitation, or replacement of any previously authorized, currently serviceable structure or fill,' with a two-year window for structures damaged by storms or other discrete events.
  • NWP 13 (Bank Stabilization) lists bulkheads among covered methods. It is limited to 500 feet along the bank unless waived, the Corps cannot waive that limit for a bulkhead longer than 1,000 feet, and fill is limited to an average of one cubic yard per running foot below the high tide line unless waived.

A nationwide permit is not the same as no permit. Some activities require a pre-construction notification to the Corps; under NWP 13, for example, that includes work longer than 500 feet. Regional conditions can add further requirements.

What Changed With the State Programmatic General Permit

For years, many minor Florida shoreline projects received federal authorization through the Jacksonville District's State Programmatic General Permit, verified by DEP alongside the state review. The SPGP VI permit (opens in a new tab) lists an expiration date of July 27, 2026 and says it 'will not be extended beyond the expiration date but may be replaced by a new SPGP.' We could not find a successor as of this review, so ask DEP or the Corps which federal authorization applies to your project.

Florida's State 404 Program, which took over Section 404 permitting in state-assumed waters from December 2020, has been paused since a February 15, 2024 federal court order, according to DEP's State 404 page (opens in a new tab). With the state program paused, plan on the Corps for Section 404 review.

State Environmental Resource Permits and Exemptions

DEP's Environmental Resource Permitting program (opens in a new tab) regulates 'activities involving the alteration of surface water flows,' including dredging and filling in wetlands and other surface waters. Seawalls, riprap and docks fall under it. Chapter 62-330, F.A.C. sets out exemptions, general permits and individual permits.

DEP or a Water Management District?

ERP applications and state-owned submerged lands authorizations are processed either by one of DEP's six district offices or by one of the five water management districts, under operating agreements. DEP generally reviews docking facilities not part of a larger plan of development, 'systems serving only one single-family dwelling unit or residential unit not part of a larger common plan of development,' and anything partly seaward of the CCCL. The districts review the rest. For most individual homeowners that points to the DEP district office, but confirm with the agency.

Water management districts by county, as listed by DEP
DistrictWhole countiesParts of
Northwest Florida (NWFWMD)Bay, Calhoun, Escambia, Franklin, Gadsden, Gulf, Holmes, Jackson, Leon, Liberty, Okaloosa, Santa Rosa, Wakulla, Walton, WashingtonJefferson
Suwannee River (SRWMD)Columbia, Dixie, Gilchrist, Hamilton, Lafayette, Madison, Suwannee, Taylor, UnionAlachua, Baker, Bradford, Jefferson, Levy
St. Johns River (SJRWMD)Brevard, Clay, Duval, Flagler, Indian River, Nassau, Seminole, St. Johns, VolusiaAlachua, Baker, Bradford, Lake, Marion, Okeechobee, Orange, Osceola, Putnam
Southwest Florida (SWFWMD)Citrus, DeSoto, Hardee, Hernando, Hillsborough, Manatee, Pasco, Pinellas, Sarasota, SumterCharlotte, Highlands, Lake, Levy, Marion, Polk
South Florida (SFWMD)Broward, Collier, Glades, Hendry, Lee, Martin, Miami-Dade, Monroe, Palm Beach, St. LucieCharlotte, Highlands, Okeechobee, Orange, Osceola, Polk

The 18-Inch Seawall Restoration Exemption

Section 403.813(1)(e), F.S. exempts 'the restoration of seawalls at their previous locations or upland of, or within 18 inches waterward of, their previous locations.' Rule 62-330.051(12)(b), F.A.C. (opens in a new tab) adds three conditions:

  1. The wall was damaged or destroyed within the last year by a discrete event such as a storm, flood, accident or fire, or the work involves only minimal backfilling to level the land and land reclamation is not the main purpose.
  2. The restored wall is no more than 18 inches waterward of the old one, measured from the waterward face of the existing seawall to the face of the restored seawall.
  3. Any permits required under Chapter 161, F.S. (the beach and shore program, including the CCCL) are obtained.

What the 18-Inch Rule Does Not Do

It is an exemption from state ERP permitting only. The rule itself says exempt work on state-owned submerged lands still needs a separate state-lands authorization, and it does not replace federal authorization or your local building permit. It is also a restoration rule, not a general right to build a new wall farther out.

Other Seawall Exemptions and the Riprap General Permit

  • Artificial waterways: construction, replacement and repair of seawalls or riprap in artificially created waterways and legally existing residential canal systems, with only the backfill needed to level the land (62-330.051(12)(a)). Under 403.813(1)(i), F.S., this does not cover vertical seawalls in estuaries or lagoons unless the canal is already partly lined with vertical seawalls.
  • Infill walls: a new wall between and adjoining existing seawalls at both ends, on a continuous line with them and no more than 150 feet long (403.813(1)(o), F.S. and 62-330.051(12)(c)).
  • Stabilizing an existing wall: batter piles, king piles or a seawall cap 'used exclusively to stabilize and repair seawalls,' provided they do not impede navigation (62-330.051(12)(d)).
  • Living shoreline plantings: native wetland plantings on 500 linear feet of shoreline or less, extending no more than 10 feet waterward of the mean or ordinary high water line, with conditions (62-330.051(12)(e)).
  • Riprap at the toe of a seawall: a general permit, not an exemption, for riprap no steeper than 2 horizontal to 1 vertical and no more than 10 feet from the toe, using natural boulders or clean concrete rubble, with no filling of seagrass beds or coral communities (Rule 62-330.431 (opens in a new tab)).

Estuaries and Lagoons

Section 373.414(5), F.S. (opens in a new tab) aims 'to protect estuaries and lagoons from the damage created by construction of vertical seawalls.' New vertical seawalls there are limited to ports, marinas and public facilities, public utilities, and existing manmade canals whose shoreline is already partly seawalled. When an existing vertical seawall is repaired or replaced, the agency 'shall generally require such seawall to be faced with riprap material, or to be replaced entirely with riprap material' unless one of those conditions applies.

Verifying an Exemption

Under Rule 62-330.050, F.A.C. (opens in a new tab), most exempt activities need no notice to the agency, and owners are encouraged but not required to use DEP's electronic self-certification. You can instead request written verification on Form 62-330.050(1) with a location map, drawings, the tax parcel number, contact details, owner authorization for inspection and the processing fee. DEP's Submitting an ERP page (opens in a new tab) directs applicants to the DEP Business Portal and states that 'there is no fee for using ESSA self-cert.'

Section 403.813(1) also says a local government may not require a person claiming one of these exemptions to provide further DEP verification. Local building requirements still apply, and many contractors keep a verification or self-certification on file anyway.

State Lands, Aquatic Preserves, Bulkhead Lines and Beaches

Sovereign Submerged Lands

Florida holds title to many submerged lands under navigable waters, known as sovereign submerged lands. Section 253.77, F.S. (opens in a new tab) bars any construction on state lands until the owner 'has received the required lease, license, easement, or other form of consent.' Under Rule 18-21.005 (opens in a new tab), consent is granted by rule for many 403.813(1) exempt activities outside aquatic preserves and certain other areas, and a written letter of consent covers construction or replacement of seawalls and bulkheads 'that extend no more than three feet waterward of the line of mean or ordinary high water.' Not every waterfront lot fronts state-owned submerged land, and ownership is a title question for the agency.

Aquatic Preserves

Aquatic preserves carry stricter rules. Rule 18-20.004(1)(c) (opens in a new tab) bars construction of seawalls waterward of the mean or ordinary high water line except in limited cases. The rule exempts restoration of a seawall 'within one foot waterward of its previous location' from applying for consent of use, while section 258.42(3)(e)4., F.S. (opens in a new tab) refers to restoration 'within 18 inches waterward.' Because the two texts differ, ask DEP which applies before planning work in a preserve.

Bulkhead Lines

Older references to bulkhead lines under section 253.122, F.S. are out of date: that section no longer appears in the 2026 statutes. Section 253.1221 (opens in a new tab) provides that 'all bulkhead lines heretofore established pursuant to former s. 253.122 are hereby established at the line of mean high water or ordinary high water,' with no filling waterward of that line except under Chapter 253. Pinellas County has its own provision in section 253.66 (opens in a new tab). Old plats and local codes may still show bulkhead lines, so confirm how they apply locally.

Sandy Beaches and the Coastal Construction Control Line

On the open coast, DEP's CCCL program (opens in a new tab) applies 'along sandy beaches of the state' that front the Gulf, the Atlantic and the Straits of Florida. 'Unless otherwise exempt, a permit is required from DEP for construction and excavation activities seaward of the CCCL.' DEP notes the line 'is not a seaward limit for construction of upland structures (as in a setback line).' Typical canal, river and bay seawalls are not on the beach and dune system, so the CCCL usually does not reach them.

The CCCL rules in Chapter 62B-33, F.A.C., including the coastal armoring rule 62B-33.0051, were amended effective July 7, 2026. Rule 62B-33.004 exempts 'the minor maintenance of bulkheads and seawalls specifically involving scraping, chipping, sandblasting, guniting, and painting.' Larger oceanfront wall work generally needs CCCL review, and the 18-inch ERP exemption expressly requires any Chapter 161 permits to be obtained.

County and City Permits and Local Seawall Rules

County and city building departments issue building permits under the Florida Building Code, inspect the work, and in some places add their own seawall rules. Inside city limits, the city is usually the building permit office; in unincorporated areas, the county is. A few examples from official local sources show how much this varies:

  • Pinellas County: the county's Water and Navigation section (opens in a new tab) requires permits for seawalls, riprap, docks and all dredging or filling within county waters, in the cities and unincorporated areas alike. See the Pinellas County guide.
  • Cape Coral: the city's residential seawall guideline asks for a site plan locating the seawall at the property line and lists 'DEP approval OR SAJ-91 (except for Freshwater).' See the Lee County and Cape Coral guide.
  • Miami-Dade County: the county's Class I permit package (opens in a new tab) (revised May 2025) states that Section 24-48 of the county code requires a Class I permit for 'all work in, on, over, or upon the tidal waters or coastal wetlands' of the county, including areas within municipalities.
  • St. Johns County: bulkheads crossing county-owned oceanfront rights-of-way must be designed by a Florida professional engineer, use vinyl sheeting or cribbing at a minimum, and have a concrete cap and tie-backs. See the St. Johns County guide.
  • City of St. Augustine: bulkhead and retaining wall permits list building plans, a property survey and Planning and Zoning Board approval if applicable, and work in historic districts needs a Certificate of Appropriateness first.

The New $7,500 Building Permit Exemption

A 2026 law, CS/CS/HB 803 (Chapter 2026-63) (opens in a new tab), effective July 1, 2026, requires local governments to exempt single-family owners and their contractors from building permits for work valued at less than $7,500. The exemption does not apply to work on a property 'partially or entirely located in a flood hazard area,' or to 'any electrical, plumbing, structural, mechanical, or gas work,' a project may not be split to avoid the limit, and the owner or contractor must submit a written exemption request to the local building office. Seawall work usually involves structural elements and many waterfront lots lie in flood hazard areas, so ask your building department before relying on it. It covers only the building permit, not environmental approvals.

Mangroves, Seagrass and Manatees

Mangroves. Under section 403.9324 (opens in a new tab), the Mangrove Trimming and Preservation Act (sections 403.9321 to 403.9333, F.S.) and lawful delegated local programs are 'the sole regulations in this state for the trimming and alteration of mangroves.' Section 403.9326 (opens in a new tab) exempts some trimming in riparian fringes; for example, an owner may trim mangroves no taller than 10 feet, not below 6 feet, on a shoreline of 150 feet or less, with no herbicides. Under section 403.9328(5) (opens in a new tab), no separate mangrove permit is needed when the alteration is part of an activity exempt under 403.813 or permitted under the ERP statute; those procedures control instead. Trimming exemptions do not authorize removing mangroves for a new wall.

Seagrass and other habitat. Several authorizations exclude seagrass. The riprap general permit allows 'no filling of submerged grassbeds or coral communities,' and agencies review habitat in front of the wall when a project goes beyond an exemption.

Manatees and other listed species. For exemptions that call for them, Rule 62-330.050(9)(c) sets conditions for in-water work in waters accessible to listed species 'such as manatees, marine turtles, smalltooth sawfish, and Gulf sturgeon,' including shutting down in-water activity 'if a listed species comes within 50 feet of the work area.' FWC manatee protection zones are boating rules, and FWC-approved county manatee protection plans are 'used by FWC and the regulatory agencies when reviewing permit applications for new or expanding boat facilities.'

How to Find Your Agencies and Prepare

  1. Describe the waterwayNote whether the wall faces a dredged canal, a river, a bay or estuary, or an ocean or Gulf beach, and whether the water is tidal or fresh. These facts drive which exemptions and rules can apply.
  2. Check the beach lineIf the property is on a sandy ocean or Gulf beach, ask DEP's CCCL program or your county whether the work is seaward of the CCCL.
  3. Find your state officesUse DEP's district pages and its water management district list to identify your DEP district office and district. For a single-family wall not part of a larger development, start with the DEP district office.
  4. Ask about the bottomAsk whether the submerged land in front of the wall is state-owned and whether it lies in an aquatic preserve. That decides whether state-lands consent and preserve rules apply.
  5. Confirm federal authorizationAsk the Corps, or DEP during state review, which federal authorization covers the work. Requests can be submitted through the Corps Regulatory Request System.
  6. Call the local permit officeContact the city if you are inside city limits, or the county if you are not, and ask which permit type, drawings and approvals they need and in what order.
  7. Plan the sequenceSome local offices want state or federal approval first. St. Johns County's process for bulkheads across county oceanfront rights-of-way requires the FDEP permit before formal review, and Cape Coral's repair guideline lists DEP approval or SAJ-91 before the first inspection, except on freshwater canals.

Documents Agencies Commonly Ask For

Typical application package (varies by agency)

  • A property survey or site plan showing the wall's location, length and nearby structures
  • Construction drawings and details; signed and sealed engineering where the agency requires it
  • A location map and the tax parcel identification number
  • Owner authorization, and adjacent-owner authorization where a wall ties into a neighbor's
  • State exemption verification or permit and federal authorization, if the local office requires them
  • A recorded Notice of Commencement when the project value exceeds the local threshold
  • Local affidavits or elevation information, such as protected-species affidavits or cap elevations

How Long It Takes

Official timelines exist only for some steps. For an exemption verification request, the agency 'shall take reasonable efforts' to respond within 30 days (Rule 62-330.050(4)). For an ERP permit application, section 373.4141, F.S. (opens in a new tab) requires the agency to request any additional information within 30 days and to approve, deny or issue a notice of proposed action within 60 days after receiving the application or the last requested information. Federal and local review times vary, so build agency review into your schedule rather than assuming a date.

In Northeast Florida (Duval, St. Johns, Nassau, Clay, Flagler and Putnam counties), Barefoot Marine Construction, based in Jacksonville, serves owners directly, and Plan & Permit is a standard step in its project process. Elsewhere, Florida Bulk Head accepts inquiries through a partner network that is still being built; matching is subject to contractor availability. See project planning for how permitting fits into the overall timeline.

Resilient Florida: What It Is and Is Not

The Resilient Florida Program (opens in a new tab) is a set of DEP grants 'available to counties, municipalities, special districts with specific responsibilities and regional resilience entities.' Under section 380.093, F.S. (opens in a new tab), grants to counties and cities can fund resilience planning, vulnerability assessments for flooding and sea level rise, critical asset inventory updates, and the development of projects, plans and policies that prepare communities for flooding and sea level rise.

It is not a permit, it does not change the permits a private seawall needs, and it is not a homeowner grant program. A local government's vulnerability assessment or resilience project can, however, shape public seawall projects and future local standards in your community.

Frequently asked questions

Can I replace my seawall without a permit if I stay within 18 inches of the old one?

The 18-inch rule is an exemption from state Environmental Resource Permitting only, and it comes with conditions in Rule 62-330.051(12)(b), F.A.C., such as recent storm damage or only minimal backfilling. Federal authorization, state-lands consent, CCCL permits on the beach and local building permits can still apply. Confirm with DEP and your local building department before work starts.

Do I need a permit to repair or replace a seawall cap?

Rule 62-330.051(12)(d), F.A.C. exempts batter piles, king piles or a seawall cap used exclusively to stabilize and repair a seawall, provided they do not impede navigation. That is a state ERP exemption, not a building permit exemption. Ask your city or county building department what it requires for cap work.

Does the Coastal Construction Control Line apply to my canal seawall?

Usually not. DEP describes the CCCL as applying along sandy beaches that front the Gulf, the Atlantic and the Straits of Florida. Walls on canals, rivers and bays landward of the beach and dune system are normally outside it, but ask DEP or your county if you are near the beach.

Is the State Programmatic General Permit still available?

SPGP VI's own terms list an expiration date of July 27, 2026, and we could not confirm a successor as of November 2, 2026. Federal authorization may instead come through a nationwide permit, such as NWP 3 or NWP 13, or an individual permit. Ask DEP or the Corps which applies to your project.

Who decides whether DEP or the water management district reviews my project?

Operating agreements between DEP and the districts decide. DEP generally handles systems serving one single-family home that are not part of a larger plan of development, docks not part of a larger development and anything seaward of the CCCL, and the districts handle the rest. The agency will confirm when you apply.

Can I trim the mangroves in front of my seawall?

Possibly, within the exemptions in section 403.9326, F.S., which set height limits and ban herbicides, or through a delegated local program where one exists. Removing or altering mangroves as part of seawall work is handled through the ERP process instead. Check with DEP or your local mangrove program first.

Does the new $7,500 permit exemption cover seawall work?

Probably not for most seawall projects. Chapter 2026-63, Laws of Florida, excludes structural work and any work on property partly or entirely in a flood hazard area. It also covers only building permits, not state or federal environmental approvals, so ask your building department.

Will Resilient Florida pay for my private seawall?

Resilient Florida grants go to counties, municipalities, certain special districts and regional resilience entities, not to individual homeowners. The program is not a permit and does not change what a private seawall project needs.

Sources and references

  1. 33 CFR 322.3, Activities requiring permits (Section 10) — Electronic Code of Federal Regulations. Accessed November 2, 2026.
  2. Reissuance and Modification of Nationwide Permits (91 FR 768, January 8, 2026) — U.S. Army Corps of Engineers, Federal Register (GovInfo). Accessed November 3, 2026.
  3. State Programmatic General Permit VI (SAJ-2015-02575) — U.S. Army Corps of Engineers, Jacksonville District (hosted by Florida DEP). Accessed November 2, 2026. Lists an expiration date of July 27, 2026
  4. State 404 Program — Florida DEP. Accessed November 2, 2026.
  5. Environmental Resource Permitting — Florida DEP. Accessed November 2, 2026.
  6. Section 403.813, F.S., Permits issued at district centers; exceptions — Florida Legislature. Accessed November 2, 2026.
  7. Rule 62-330.051, F.A.C., Exempt Activities — Florida Administrative Code. Accessed November 2, 2026.
  8. Rule 62-330.050, F.A.C., Procedures for Review and Agency Action on Exemption Requests — Florida Administrative Code. Accessed November 2, 2026.
  9. Section 373.414, F.S., Additional criteria for activities in surface waters and wetlands — Florida Legislature. Accessed November 2, 2026.
  10. Rule 18-21.005, F.A.C., Forms of Authorization (sovereign submerged lands) — Florida Administrative Code. Accessed November 2, 2026.
  11. Section 253.1221, F.S., Bulkhead lines; reestablishment — Florida Legislature. Accessed November 2, 2026.
  12. Apply for a Coastal Construction Control Line (CCCL) Permit — Florida DEP. Accessed November 2, 2026.
  13. Resilient Florida Program — Florida DEP. Accessed November 2, 2026.
  14. CS/CS/HB 803 (2026), Building Permits and Inspections (Chapter 2026-63) — The Florida Senate. Accessed November 2, 2026.
  15. Docks and Dredge and Fill (Water and Navigation permits) — Pinellas County. Accessed November 3, 2026.
  16. Class I Permit Application Package (Revised May 2025) — Miami-Dade County Regulatory and Economic Resources. Accessed November 3, 2026.

Regulations, programs and conditions change. Always confirm requirements with the agency that has jurisdiction over your property.

Permit GuideDuval County Seawall Permits: Jacksonville and the BeachesWho issues seawall and bulkhead permits in Jacksonville, Jacksonville Beach, Atlantic Beach and Neptune Beach, plus the state, regional and federal reviews that sit alongside them.Read more Permit GuideSt. Johns County Seawall Permits: County, St. Augustine and the BeachesHow seawall and bulkhead permits work in unincorporated St. Johns County, the City of St. Augustine and St. Augustine Beach, including the county's oceanfront right-of-way bulkhead criteria.Read more Permit GuideLee County and Cape Coral Seawall PermitsCape Coral's seawall guidelines, the freshwater and Gulf-access canal split, Fort Myers and Fort Myers Beach permit offices, and the state, regional and federal reviews for Lee County walls.Read more Permit GuidePinellas County Seawall Permits: Water and Navigation and City RulesWhy a Pinellas seawall needs a county Water and Navigation permit even inside city limits, how building permits fit alongside it, the city rules on seawall height, and the aquatic preserve and bulkhead line rules that cover county waters.Read more Cost & PlanningPlanning a Seawall or Bulkhead Project in FloridaThe step-by-step path from noticing a seawall problem to a finished wall: assessments, engineering, permits, comparable bids, contracts, construction day and records.Read more GuideSeawall Repair vs. Replacement: How to DecideA five-question framework and a condition-by-condition table to help you judge whether a seawall needs targeted repair or replacement, before you compare quotes.Read more